Install our extension to search inside any video instantly.

They Found a Fault Line… Halfway Through Building This Dam
Added:

149 views33likes14:18NorthandForthOriginal Release: 2026-05-10

When engineers discovered an active fault line (Dunstan Fault) running through the Clyde Dam site in the 1980s, they solved the problem by creating a 2-meter gap through the dam with a concrete plug at the end, which is held in place by the weight of the 430 million cubic meters of water in the 26 km² lake; this design allows the dam to move during seismic events while preventing catastrophic failure, as the fault is believed to produce earthquakes of maximum 7.5 magnitude.

Related Videos

직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp

월드촌촌

2K views2026-05-30

Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks

ElectricianTips-b1h

5K views2026-06-02

Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line

TrainsTrainsTrains

822 views2026-05-31

AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic

bobbby_rn

671 views2026-05-31

Stalin’s Secret Fixation

Dr_Omnia3.14

784 views2026-06-05

We Really Needed This…

bastarricafarms

627 views2026-06-02

Checking On A System For New Customer!

HVACGUY

688 views2026-06-04

ALMOST COMPLETED:MILE 2 Interchange Nears Completion | Mega Construction Project

Emmanuelthecreator

267 views2026-06-04

Trending

Why Batman Lets The Joker Live 🤨

zackdfilms

9222K views2026-05-30

This spider is a VAMPIRE (Kinda...)

moreparz

2764K views2026-06-02

Making Ai Choose Where I Eat

Tyrecordslol

3080K views2026-06-03

They're Complete Trash

penguinz0

558K views2026-06-04