Instala nuestra extensión para buscar dentro de cualquier video al instante

FINI! RV-10 Inspection prep, first engine run and Airworthiness Inspection
Añadido:

162 vistas21me gusta15:57baselegaviation1614Lanzamiento original: 2026-05-29

Preparing an RV-10 for airworthiness inspection requires thorough self-inspection with multiple reviewers, safety wiring all nuts and bolts, setting low pitch stops on the propeller to prevent overspeed during initial takeoff by running the engine to approximately 2650 RPM, conducting fuel flow tests to verify 150% of maximum fuel flow, and completing weight and balance calculations; the first engine run should be carefully monitored with the propeller governor adjusted to prevent overspeed, and the aircraft should be secured with alternative methods like a pickup truck and tail tie-down during initial runs since brakes are not yet seated.

Videos Relacionados

직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp

월드촌촌

2K views2026-05-30

Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks

ElectricianTips-b1h

5K views2026-06-02

Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line

TrainsTrainsTrains

822 views2026-05-31

AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic

bobbby_rn

671 views2026-05-31

Stalin’s Secret Fixation

Dr_Omnia3.14

784 views2026-06-05

We Really Needed This…

bastarricafarms

627 views2026-06-02

ALMOST COMPLETED:MILE 2 Interchange Nears Completion | Mega Construction Project

Emmanuelthecreator

267 views2026-06-04

Mosquito Zapper with Schematic and Comparison to other Zappers

retireeelectronics2649

145 views2026-06-03

Tendencias

Why Batman Lets The Joker Live 🤨

zackdfilms

9222K views2026-05-30

This spider is a VAMPIRE (Kinda...)

moreparz

2764K views2026-06-02

Making Ai Choose Where I Eat

Tyrecordslol

3080K views2026-06-03

They're Complete Trash

penguinz0

558K views2026-06-04