The Hoover Dam's construction engineers solved the critical problem of thermal stress in massive concrete structures by dividing the dam into hundreds of independent concrete columns (7.6m squared), separated by tar paper to allow independent thermal expansion and contraction, with each column containing approximately 300 meters of thin steel cooling pipe, resulting in a total cooling pipe length of about 1,000 km embedded throughout the dam.
深掘り
前提条件
- データがありません。
拡張機能をインストールして、あらゆる動画内を即座に検索しましょう
次のステップ
- データがありません。
深掘り
By the summer of 1933, engineers broke the Hoover Dam into hundreds of independent concrete blocks c追加:
By the summer of 1,933, engineers broke the Hoover Dam into hundreds of independent concrete blocks called columns, each roughly 7.6 m squared >> [music] >> and separated by tar paper to allow independent thermal expansion and contraction. Each column contained roughly 300 m of thin steel cooling pipe threaded through it. And when the arithmetic was finished, the total length of cooling pipe embedded in the dam came to approximately 1,000 km.
関連おすすめ
직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp
월드촌촌
2K views•2026-05-30
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K views•2026-06-02
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 views•2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 views•2026-05-31
We Really Needed This…
bastarricafarms
627 views•2026-06-02
ALMOST COMPLETED:MILE 2 Interchange Nears Completion | Mega Construction Project
Emmanuelthecreator
267 views•2026-06-04
Mosquito Zapper with Schematic and Comparison to other Zappers
retireeelectronics2649
145 views•2026-06-03
Why you still can't book the 20-hour flight #travel #qantas #aviation
theavidaviator
1K views•2026-05-31