The Hoover Dam's construction engineers solved the critical problem of thermal stress in massive concrete structures by dividing the dam into hundreds of independent concrete columns (7.6m squared), separated by tar paper to allow independent thermal expansion and contraction, with each column containing approximately 300 meters of thin steel cooling pipe, resulting in a total cooling pipe length of about 1,000 km embedded throughout the dam.
Approfondir
Prérequis
- Pas de données disponibles.
Installez notre extension pour rechercher instantanément dans n'importe quelle vidéo
Prochaines étapes
- Pas de données disponibles.
Approfondir
By the summer of 1933, engineers broke the Hoover Dam into hundreds of independent concrete blocks cAjouté :
By the summer of 1,933, engineers broke the Hoover Dam into hundreds of independent concrete blocks called columns, each roughly 7.6 m squared >> [music] >> and separated by tar paper to allow independent thermal expansion and contraction. Each column contained roughly 300 m of thin steel cooling pipe threaded through it. And when the arithmetic was finished, the total length of cooling pipe embedded in the dam came to approximately 1,000 km.
Vidéos Similaires
직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp
월드촌촌
2K views•2026-05-30
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K views•2026-06-02
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 views•2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 views•2026-05-31
Stalin’s Secret Fixation
Dr_Omnia3.14
784 views•2026-06-05
We Really Needed This…
bastarricafarms
627 views•2026-06-02
Checking On A System For New Customer!
HVACGUY
688 views•2026-06-04
ALMOST COMPLETED:MILE 2 Interchange Nears Completion | Mega Construction Project
Emmanuelthecreator
267 views•2026-06-04