When installing a fireplace with steel stud framing, the framing kit should be recessed by 1/8 inch to align flush with 1/2-inch drywall, and high-heat compound (Durabond 90) should be used around the fireplace area while regular compound is used elsewhere; for retrofit installations, venting may need to be rerouted beneath the floor system and out through the exterior wall, requiring a draft fan on the exterior for safe and efficient operation.
Approfondir
Prérequis
- Pas de données disponibles.
Installez notre extension pour rechercher instantanément dans n'importe quelle vidéo
Prochaines étapes
- Pas de données disponibles.
Approfondir
May 12, 2026Ajouté :
All right, guys. That's all boarded up.
Um so, the steel stud framing kit is in there, obviously. That's 5/8 type X.
That framing kit was recessed by an eighth of an inch to plane flush with the 1/2-in drywall. We're going to use high heat compound, Durabond 90, around that area. Everything else is just getting regular CGC. And uh yeah, we're going to get taping this and get this all ready for paint.
Vidéos Similaires
직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp
월드촌촌
2K views•2026-05-30
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K views•2026-06-02
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 views•2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 views•2026-05-31
Stalin’s Secret Fixation
Dr_Omnia3.14
784 views•2026-06-05
We Really Needed This…
bastarricafarms
627 views•2026-06-02
ALMOST COMPLETED:MILE 2 Interchange Nears Completion | Mega Construction Project
Emmanuelthecreator
267 views•2026-06-04
Mosquito Zapper with Schematic and Comparison to other Zappers
retireeelectronics2649
145 views•2026-06-03











