In oil and gas drilling operations, pressure testing is essential to verify that a well's cement plug can safely contain oil and gas; when pressure readings spike during testing, it indicates a leak, requiring immediate attention to prevent catastrophic failures.
深度探索
先修知识
- 暂无数据。
后续步骤
- 暂无数据。
深度探索
The Start of the Deepwater Horizon Accident本站添加:
By the end of that day, only one step remained before the Deepwater Horizon's crew could officially plug their new well and move on.
Turning off the mud and replacing it with seawater, which sounds simple enough.
But on one of these babies, nothing is simple.
Here, they have to slowly release the pressure being forced down onto the well to see if the concrete plug is strong enough to hold the oil and gas.
And the pressure test that evening did not go as planned.
The test was inconclusive. Readings showed that the pressure had spiked when the mud was turned off, which indicated that the well was leaking.
But members of BP's management team were getting testy.
They insisted that the test had gone to plan and the crew's job was all but done.
相关推荐
직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp
월드촌촌
2K views•2026-05-30
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K views•2026-06-02
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 views•2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 views•2026-05-31
Stalin’s Secret Fixation
Dr_Omnia3.14
784 views•2026-06-05
We Really Needed This…
bastarricafarms
627 views•2026-06-02
Checking On A System For New Customer!
HVACGUY
688 views•2026-06-04
ALMOST COMPLETED:MILE 2 Interchange Nears Completion | Mega Construction Project
Emmanuelthecreator
267 views•2026-06-04