Large concrete structures like dams require sophisticated thermal management to prevent cracking; this is achieved by embedding thousands of kilometers of thin steel pipes throughout the interior, through which cold water circulates after each concrete lift to carry heat away from the core, combined with limiting each concrete column to 15 meters on a side and 1.5 meters in height with a minimum 3-day curing period between lifts.
Approfondir
Prérequis
- Pas de données disponibles.
Prochaines étapes
- Pas de données disponibles.
Approfondir
The solution involved embedding thousands of kilometers of thin steel pipes throughout the dam's intAjouté :
The solution involved embedding thousands of kilometers of thin steel pipes throughout the dam's interior.
Cold water circulated through these serpentine pipes after each concrete lift, carrying heat away from the core and preventing catastrophic thermal cracking. Each concrete column was limited to 15 m on a side and 1.5 m in height with a minimum curing period of 3 days between lifts. This block pour method transformed an impossible thermal problem into a methodical sequence of thousands of individual placement.
Vidéos Similaires
직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp
월드촌촌
2K views•2026-05-30
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K views•2026-06-02
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 views•2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 views•2026-05-31
Stalin’s Secret Fixation
Dr_Omnia3.14
784 views•2026-06-05
We Really Needed This…
bastarricafarms
627 views•2026-06-02
ALMOST COMPLETED:MILE 2 Interchange Nears Completion | Mega Construction Project
Emmanuelthecreator
267 views•2026-06-04
Mosquito Zapper with Schematic and Comparison to other Zappers
retireeelectronics2649
145 views•2026-06-03











