Wind power's intermittency creates significant cost challenges because it requires either expensive battery storage systems (which currently cannot provide sufficient backup capacity and pose environmental and fire hazards) or legacy power generation infrastructure (gas, coal, nuclear, hydro) as backup, effectively doubling the cost of power generation; additionally, prematurely retiring existing capital assets with years of remaining useful life compounds these inefficiencies.
深掘り
前提条件
- データがありません。
次のステップ
- データがありません。
深掘り
Wind Power: The Expensive Truth You Need to Know追加:
If it did, they should be ashamed of themselves because it's one of the most misused measures in the history of of public policy because it doesn't take into account what we just talked about, that intermittency. So, sure, wind when it's running can be cheap, but then it has to have essentially 100% backup for when it isn't there. So, you put all the capital investment in to build wind and then you either have to have batteries, which so far can't provide enough backup to to be feasible.
Um and which are also an environmental nightmare and a fire hazard and all kinds of other things. Um or you have to have a legacy generating system like our existing gas and coal and nuclear and hydro to back it up. So, you're essentially paying for your power generation twice. Um the other thing, too, is too often here lately, we've been installing, installing, installing wind and also solar and prematurely retiring these capital assets that still had years and years of life ahead of them that that we've already paid for. So, just piling insanity upon insanity.
関連おすすめ
직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp
월드촌촌
2K views•2026-05-30
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K views•2026-06-02
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 views•2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 views•2026-05-31
We Really Needed This…
bastarricafarms
627 views•2026-06-02
ALMOST COMPLETED:MILE 2 Interchange Nears Completion | Mega Construction Project
Emmanuelthecreator
267 views•2026-06-04
Mosquito Zapper with Schematic and Comparison to other Zappers
retireeelectronics2649
145 views•2026-06-03
Why you still can't book the 20-hour flight #travel #qantas #aviation
theavidaviator
1K views•2026-05-31











