When building a house, unexpected challenges like encountering large rocks during trenching require adaptive solutions that may increase costs, making proper documentation and careful budget management essential throughout the construction process.
Deep Dive
Voraussetzung
- Keine Daten verfügbar.
Nächste Schritte
- Keine Daten verfügbar.
Deep Dive
How They Are Building A 4 Bedroomed House In ZimbabweHinzugefügt:
So after handling the boulder situation that was found when trenching they decided they could have the engineer hopped on the project me till they get to the stage they want. So the beauty about building your own house is this you can actually do it in stages. If you are not in a position to do it at one goal, you can start with a stage and while it's the stage is progressing, you'll be also working on putting funds together for the next stage.
Hello guys, welcome back to the channel.
So today's video is a continuation of this video which went into detail on dealing with the unexpected when you have already started your project. So on that project they found a very big uh a very big and hard rock when they were trenching. So after a number of tests, calculations and deliberations, we decided to proceed with the project in a manner which is suitable and conducive to the particular project. So solutions for situations that you encounter when you're building obviously they are not a one size fit all. You can actually see that on this particular stand we took measures that we took and then if the same situation is going to be found on the next stand we might use a different solutions. So it's very important and necessary to have the right people to come and assess the type of problem that you have so that they uh make a a solution which is conducive for the problem.
So here the part that I am jumping into there you can actually see that the trench is quite wider than the usual and normal trenches.
So, as I mentioned in that other video, a JCB had to get in here when they were trying to trench, but then because of the nature of the rock, they couldn't get to the level that they they wanted as well. So, a way had to be paved for the JCB to get in. And for that to happen they had to sacrifice that area so that they could try and see what they could do. So that changes alone it can actually have an impact on your budget.
Though to a lesser extent comparing to the nature of the project but these are small changes that happen they should not be taken for granted as it is something that is going to add on to to the bill. So during construction any changes that will be made they're equals to money. Any mistakes that are going to be made equals money. Decisions that are going to be made or taken equals money.
Wrong decisions more money.
Late decisions money as well. So this is something that uh piles to the bill if you do not um take much look into it.
So this house it's sitting on 220 square m. It's located here in Harare. It is a four bedroomedroom house. Uh it has a master bedroom that has an on suite and then three other bedrooms which do not have uh insuit. And then we have the common bathroom then the kitchen, the lounge, the garage and those are the rooms that are are there.
All right. So so far we've used 10,000 bricks. We have 20 cubic 3/4 stones and 20 cubic river sand. And then water. We had to get water as well. And then also for for the sitting outs, we paid a certain fee for the sitting out. And then for the JCB, it was hired for 4 hours. And then the pom pom, like I said, they first tried with the pom pom.
So these are some of the costs that I'm just what um compiling. So they had to pay for that. The fuel and the transport as well. And then the excavation itself it was paid for. And then for water so far 10,000 L has been used. And then the cement that has been used so far we have 30 bags of cement. Then there's brick force. The fuel we cater for it. And then also some money had to be given from for food to the builders. So this depends with the with the contract that you have with the people who will be working for you. Some they just choose to give them money and say well sort yourselves out and then uh some contractors will say uh that you can get groceries, food items for us. It will not be part of the bill that they charge you. So this all depends with the with the contract that you have. And then we have 30 bags of cement again.
Then there's brick force uh fuel. And then we had to get in another 5,000 lit of water. And then we had to add 14 bags of cement again and 1,200 bricks. If you remember earlier on, I mentioned um the part that I was saying that the the trench is a bit wider. That wasn't part of the plan. So, these are the additional bricks and cements that had to be added to cater for things that happened that weren't part of the plan.
When you're building your house, correct documentation and receipt keeping. It's very important. This is part of the process that should be guarded jealously because this is what will help you keep uh control of everything that will be happening on the ground.
Thank you so much guys for watching.
Don't forget to like, comment, share, and subscribe to the channel. Until next informative and progress update. Cheers.
Heat. Heat.
Ähnliche Videos
She Lost Her Car... But We Still Helped Her!
RecoveryBoyz
129 views•2026-05-30
Deadly Got Talent Auditions You Should NEVER Try at Home!
gottalentglobal
5K views•2026-05-29
Cozy Cottage Jazz | Warm Morning Cafe Ambience 🌸
villagejazzhouse
846 views•2026-05-29
DeBoer Wants Alabama Tougher, Texas Tech Calls out the Texas Longhorns | TNR 5/29/26
NextRoundLive
2K views•2026-05-29
Smart Working Techniques for Faster and Safer Jobs Part 54✅ #construction #adamrose #workers
worksmart-98
2K views•2026-05-29
LIVE: Move Into Friday with Special Guest Ed O'Brien | Morning Becomes Eclectic
kcrw
778 views•2026-05-29
On Bended Knees - Jekalyn Carr (Official Live Worship)
halalafrika
7K views•2026-05-29
Black Hills To Badlands In A Nova Bought SIGHT UNSEEN-Going To Towns Tour with HUNDREDS of CLASSICS!
ViceGripGarage
52K views•2026-05-29