Install our extension to search inside any video instantly.

3K Psi WP BOP Stack#well control #BOP#choke line #kill line#BOP #processsafety #blowoutpreventer
Added:

597 views23likes1:35DrillingHSEOriginal Release: 2026-05-17

A 3K Working Pressure BOP stack must include one annular preventer, one pipe ram or variable bore ram preventer, one shear blind ram preventer, one drilling spool, one casing head housing, and dedicated choke and kill line arrangements with two full bore valves each, including a remotely hydraulically operated valve on the choke line and a non-return valve on the kill line to prevent backflow; the drilling spool may be omitted if the lowest ram preventer has side outlets meeting dimensional requirements.

Related Videos

U.S. Military Just Flexed The Most Dangerous Aircraft Ever Built The F-47

MaxAfterburnerusa

11K views2026-05-29

Heating Staying On On The Hottest Day Of The Year

PlumbLikeTom

507 views2026-05-29

발전 효율을 높이는 태양광 추적 시스템의 기술적 원리 #공학 #공정 #태양광 #알고리즘 #재생에너지

찐현장기술

2K views2026-05-29

직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp

월드촌촌

2K views2026-05-30

Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks

ElectricianTips-b1h

5K views2026-06-02

Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line

TrainsTrainsTrains

822 views2026-05-31

AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic

bobbby_rn

671 views2026-05-31

How Far Can A Tomahawk Missile Actually Travel?

WarCurious

13K views2026-05-28

Trending

The Casino Had Us Guessing All Day

VegasMatt

157K views2026-06-03

The Dancing Plague...

HoodieGuyStories

1730K views2026-05-30

The Fastest Way To Board A Plane 😮

zackdfilms

6504K views2026-05-29

DOOM Runs On Everything...except Neo Geo

ModernVintageGamer

143K views2026-06-01