A 3K Working Pressure BOP stack must include one annular preventer, one pipe ram or variable bore ram preventer, one shear blind ram preventer, one drilling spool, one casing head housing, and dedicated choke and kill line arrangements with two full bore valves each, including a remotely hydraulically operated valve on the choke line and a non-return valve on the kill line to prevent backflow; the drilling spool may be omitted if the lowest ram preventer has side outlets meeting dimensional requirements.
Deep Dive
Prerequisite Knowledge
- No data available.
Where to go next
- No data available.
Deep Dive
3K Psi WP BOP Stack#well control #BOP#choke line #kill line#BOP #processsafety #blowoutpreventerAdded:
3k working pressure WP minimum requirements. The blowout pretor BOP stack configuration shall consist of the following components. One annular pretor, one pipe ram or variable bore ram pretor, one shear blind ram pretor, one drilling spool, one casing head housing. The stack shall also include the required choke and kill line arrangements as illustrated. Valve identification 1 76.2 2 mm (3 in) gate valve 2 76.2 mm (3 in) hydraulically operated choke line valve 3 50.8 8 mm 2 in gate valve four non- returnturn valve NRV minimum BOP stack requirements the BOP stack shall be equipped with one dedicated kill line and one dedicated choke line each line shall contain two full boore valves one valve installed on the choke line shall be remotely hydraulically operated for pressure control during well control operations a non- returnturn valve shall be installed in the dedicated kill line to prevent backflow toward the well control equipment. Drilling spool requirement where the lowest ram type pretor is equipped with side outlets that meet the specified dimensional requirements. The choke and kill lines may be connected directly to the lower pretor. In such cases, the drilling spool may be omitted from the boop stack configuration.
If you work [music] on oil rigs, this channel is for
Related Videos
U.S. Military Just Flexed The Most Dangerous Aircraft Ever Built The F-47
MaxAfterburnerusa
11K views•2026-05-29
Heating Staying On On The Hottest Day Of The Year
PlumbLikeTom
507 views•2026-05-29
발전 효율을 높이는 태양광 추적 시스템의 기술적 원리 #공학 #공정 #태양광 #알고리즘 #재생에너지
찐현장기술
2K views•2026-05-29
직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp
월드촌촌
2K views•2026-05-30
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K views•2026-06-02
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 views•2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 views•2026-05-31
How Far Can A Tomahawk Missile Actually Travel?
WarCurious
13K views•2026-05-28











