Quality interior finishes in small rental units require attention to detail in multiple stages: ceiling bendering must be set at 2.5m height for consistency; wall plastering should allow brickwork to settle first to prevent cracking, followed by primer application for better paint adhesion; PVC ceilings offer moisture resistance and low maintenance; tiling requires waterproofing in wet areas and strategic grout selection (white for walls, gray for floors); built-in cupboards maximize storage while maintaining modern aesthetics; and proper electrical installation with adequate plug points ensures functionality. Each layer from structure to finish must be executed correctly to achieve durable, professional, and visually appealing results.
Deep Dive
Prerequisite Knowledge
- No data available.
Where to go next
- No data available.
Deep Dive
Quality Interior Finishes in Small Rental Units | How much? | Build a bachelor unitAdded:
Hi guys, welcome to another episode of Transform My Space with Mav Construction. My name is Enom Somi. We finally finally came to the point where we're done with the unit. It's been months. We've changed this whole thing from just a concept on paper and brought it to reality. In this episode, we're going to share the journey. We're going to show you the ups, the downs. We're going to show a little bit about the costs. and you get to see what exactly goes into building a unit like this. If you love our type of content, please do subscribe, hit like, share the video, tell your friends, and do comment. Keen to see your thoughts in the comments.
Come have a look.
When constructing and renovating a home, attention to detail at the finishing stage is what separates average work from professional quality.
One of the key requirements is the correct installation of ceiling bendering. This should be set out properly at a standard height of 2.5 m above the finished floor, ensuring consistency throughout the building.
Wall plastering is another critical stage.
The plaster must be applied smoothly and evenly to achieve a clean surface ready for finishing. Good plastering also plays an important critical role. It allows the brick work to settle naturally over time, reducing the likelihood of cracking. A quick tip is to allow your brick work to first settle and do not rush to apply this plastering. This also helps reduce the chances of cracking. Once the plaster has been properly cured, a primer coat should be carefully applied. This acts as a base layer that seals the surface, ensures better adhesion.
Skipping or rushing this step often leads to uneven paint absorption and reduce durability of the finish. In construction, every layer matters from structure to finish. When each step is done correctly, the result is durable, professional, and visually appealing too.
He doesn't see me.
Electrical installation must also be completed and done correctly before closing up the ceiling walls. All wiring points and fittings should be properly tested and positioned to ensure safety and functionality.
At the same time, the Giza must be securely installed and neatly tucked into its designated position, allowing for both accessibility as well as a clean finish.
But I don't speak.
Now, let's start with the ceiling installation. For this unit, we installed a clean wide PVC ceiling. PVC ceilings are a great option because they are lowmaintenance, they are moisture resistant, they are easy to clean, and they don't hold dust like traditional ceilings do.
Good enough.
Good enough.
Good enough.
Another big advantage is that if there is a giza leak, the ceiling will not damage easily from the water.
[ __ ] >> I'm not [ __ ] See you later. I'm going house 10 house fresh option for the sky for the my decided to keep the finish simple with plain white ceiling boards and matching the white cornises for the modern and bright appearance. When installing cornises, detail is very important. In fact, it is everything. The glue must be cleaned carefully at the joints and corners to achieve a very neat, professional finish.
I love what we can. I don't discriminate the assess highly intelligent pass. That's the best. I won't settle for less. I wonder when I forget sex ahead of my chest.
Let's show you the tiling work. We selected a light brown tile to anchor the entire space and complement the finishes that would later be installed.
Before tiling the shower area, proper waterproofing was applied to prevent future damp and moisture problems.
The same tile was used on the bathroom walls to maintain consistency throughout the space. We used white grout on the walls for a clean, modern look and gray grout on the floors to better handle traffic and dirt. These were 300x 300 mm tiles installed using 5 mm spacing for even alignment.
Bonding liquid was also added to improve adhesion and speeding up the drying time.
Aluminium H strips are installed on all exposed corners for protection in a premium finish. It's important to mask the strips before painting to keep them clean and shiny afterwards.
down. down easy down easy down cool down down cool down cool down cool down down cool down I won't be proceeding quickly.
You forgot when I'm non.
Now on to the kitchen cabs. The built-in cabs were manufactured offsite and assembled during installation for a precise fit against the walls.
down.
>> We chose a darker brown finish which works beautifully with the lighter floor tiles creating a warm balanced contrast.
There we go.
>> When designing rental units, practicality is very important.
A dedicated washing machine connection was included because tenants need convenient laundry access.
You know my yeah yeah you know time We also installed a compact stove which helps with energy efficiency while still providing all the essentials.
We kept the kitchen window area open to maximize light coming into the space and also allow sufficient room for a future steam extractor installation above the stove.
I want I want I want I want I still I love you different things and packaging like the ocean when it comes to money.
You are not my [ __ ] If you be head of state people say I know one I know one I want. I want I want it.
know these drawings.
I think these stickers must just come and they don't look neat.
Now this is closing nicely.
Yeah.
>> I don't know if this is dirty. It looks more good progression once again this Yeah. This this thing we need to fix.
>> Yeah. Yeah. Yeah. Expose already.
Yeah.
Yeah.
Yeah.
In the corner.
primary.
>> You come in here, there's big clearance.
The seat is there. See as I walk.
>> Yeah.
>> You got absolute clearance going to my toilet.
>> Yeah.
>> Yeah. So, we have this right here in the corner.
But yeah, it's looking neat, man. If you look at this mosaic, it's done without most procedure.
It's just super super neat. Super neat.
Um toilet. So we just need to get those units.
>> These doors, please.
>> Yeah. Yeah. Yeah. Yeah. They need to come in. Yeah.
is now ready for Monday.
>> Yeah.
Oh, >> Alex, take a look inside your heart. Is there any room for me? I learn how to hold my breath down on my knee because you only want to hold me when I'm looking good enough. Did you ever f me? Would you ever pull my hair with me?
You find me ugly. And one day you disappear of crying. It was never even me. Was I ever good tonight?
Poison.
Poison.
He doesn't see. You're not looking at me. Poison.
He doesn't see you. You're not looking at me.
Now, let's take a look at the bathroom fittings. The bathroom measures 1.8x 1.8 m inside, which is an efficient size for a bachelor unit. Proper measurements are critical to ensure all fittings work properly within this space.
We installed a corner shower, a basin, a toilet to maximize movement and functionality in the space.
To optimize costs, there was no need to tile the entire bathroom. In terms of the walls, strategically, wall tiling still gives a clean, modern appearance while keeping the pro project cost effective.
You're not thinking poison.
He doesn't seem good enough.
Good enough.
Good enough.
Good enough.
Good enough.
Good enough.
Good enough.
In love.
I'm good enough. I'm good enough. I'm good enough.
Heat. Heat. N.
Come on. Let us know.
the yeah yeah I cover my face down.
I know nothing. Anything plenty to cleaning keep many things.
For the kitchen walls, we used a beautiful combination of brown and white striped tiles.
This tiled the entire kitchen designed together perfectly.
White grout was again used to maintain a clean, bright finish.
yeah yeah yeah yeah yeah yeah yeah.
And now for the final product.
>> Start by the tips.
The completed unit has an elegant modern finish with careful attention to detail throughout.
Small details make a huge difference in the overall appearance and feel of the space.
We always make sure that everything is functioning correctly before handing over the project. Checking that the taps are working properly, lights are operational, and the stove is functional.
be ugly and one day disappearing.
>> This is our TV. It's got our main switch, our LK. We've got one for the stove. We've got one for plugs. We've got one for lights and also one for this is the key.
>> All cupboards were tested to ensure smooth opening with no resistance. We installed at least three drawers, including a dedicated pot drawer and a large grocery storage compartment for practicality.
He say that I shouldn't. So I tell him one of me. He making fun of me. This girl is a bum to me like that boy is a cap home but I know where he at.
>> The room feels spacious and bright with plenty of light coming into the unit.
>> To maximize space even further, we integrated a compact wall closet onto the kitchen cupboard design. This combination with the PVC ceiling, built-in cabs, and tiled finishes creates a clean, welcoming environment.
>> We also installed at least five strategically positioned plugs points to improve convenience for future turnings.
The bathroom fittings are fully installed and operational, including the corner shower, the toilet, the basin.
What's going to say?
And there you have it, another successful transformation of space confed by Mav Construction. If you are looking to renovate, to build or transform your space, do contact us on the email provided. And again, don't forget to subscribe, like and comment.
MF Construction signing out. Thanks for watching and we'll see you on the next episode of Transform My Space with M Construction. Take care.
Related Videos
U.S. Military Just Flexed The Most Dangerous Aircraft Ever Built The F-47
MaxAfterburnerusa
11K views•2026-05-29
Heating Staying On On The Hottest Day Of The Year
PlumbLikeTom
507 views•2026-05-29
발전 효율을 높이는 태양광 추적 시스템의 기술적 원리 #공학 #공정 #태양광 #알고리즘 #재생에너지
찐현장기술
2K views•2026-05-29
직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp
월드촌촌
2K views•2026-05-30
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K views•2026-06-02
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 views•2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 views•2026-05-31
How Far Can A Tomahawk Missile Actually Travel?
WarCurious
13K views•2026-05-28