When purchasing cold-formed steel buildings, buyers should carefully review specifications to ensure all components are included, as missing items like doors, base clips, or insulation can lead to project delays and additional costs; builders can often fabricate missing components on-site, but thorough planning and understanding of building specifications are essential for successful installation.
Deep Dive
Prerequisite Knowledge
- No data available.
Where to go next
- No data available.
Deep Dive
Cold Formed Steel Building Problems-ContinuedAdded:
Hi, this is Dallas with Century Builders.
Uh I just finishing up a a project in Prescott, Arizona.
Uh I made a previous video about this building when we got here and started.
Uh this is one of the few cold-formed steel buildings that we've done.
And uh there's some things we a lot of things we learned, but uh few things that I want to go through that this owner had purchased this building and had been sitting on it for about 18 months before he found somebody to put it up.
Uh there was some things missing and some things that weren't quite done right. Again, on our website, we have some guidelines for if you're looking for a steel building, what to do, what not to do. Um unfortunately, this owner got caught in some of those traps, but he was sold this building and uh some things did not come complete and how he thought they would. Um particularly, he he ordered it with doors, it came with door openings, but no doors. We had to supply doors.
Uh it was missing base clips that we uh at our shop in Queen Creek had to make and punch, but we're able to do that and continue on the project instead of pulling off.
But uh this building has this uh lean-to with two sides on it.
With the cold-formed building, there's lots of extra bracing, lots of bolts, lots of screws uh that go into these, but there's a look at that and then that connects to this 30 by 40 uh shop space that he has.
Uh the concrete was done on others on this project. Normally, we turn the concrete down in front of the garage doors, so if the water comes down the doors and rolls out, hopefully, you don't have too much problem here, but that's something that we like to do.
Uh this building did not come with insulation, so you can see the bare metal all the way through this building.
But uh just wanted to give you a look at a different style.
Um again, please go to our website, look at the tips we have for buying a steel building before you purchase one.
Thanks.
Related Videos
U.S. Military Just Flexed The Most Dangerous Aircraft Ever Built The F-47
MaxAfterburnerusa
11K views•2026-05-29
Heating Staying On On The Hottest Day Of The Year
PlumbLikeTom
507 views•2026-05-29
발전 효율을 높이는 태양광 추적 시스템의 기술적 원리 #공학 #공정 #태양광 #알고리즘 #재생에너지
찐현장기술
2K views•2026-05-29
직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp
월드촌촌
2K views•2026-05-30
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K views•2026-06-02
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 views•2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 views•2026-05-31
How Far Can A Tomahawk Missile Actually Travel?
WarCurious
13K views•2026-05-28