This video demonstrates the final construction phase of a six-unit townhouse complex in Bali, showcasing advanced building techniques including 3.2-meter monolithic glazing windows (exceeding standard 2.5m frames), Turkish granite kitchen surfaces for durability, roughened concrete pathways for stone adhesion, and self-contained bedroom suites with en-suite bathrooms. The project highlights how specialized manufacturing capabilities enable custom architectural features while maintaining structural integrity and aesthetic coherence.
Deep Dive
Prerequisite Knowledge
- No data available.
Where to go next
- No data available.
Deep Dive
Finish lane on a massive 6 townhouses project in Bali.Added:
It's been a while since the last update from our Bukit project where we're building [music] six townhouses. We've completed the landscaping. It looks absolutely stunning. All the engineering systems are finished. The windows are installed as well. Notice their height, 3.2 [music] m. Very few projects in Bali use glazing like this. Typically, you'll see 2.5 m with a transom above, but we can produce windows of virtually any size [music] since we have our own contract manufacturing in China. The kitchen is almost done. All that's left is the final polishing [music] of the granite we brought from Turkey. It's a fantastic material. The facades are also complete and this is where [music] the refrigerator will be installed. We've also started the final finishing of the stairs.
>> [music] >> On the second floor, all finishing work is already complete. The furniture has been ordered and will be delivered very soon. This will be one of the bedrooms with its own bathroom. There's an identical bedroom on the other side.
>> [music] >> All bedrooms are self-contained, making the space very comfortable to live in.
We also have a master bedroom. Right [music] now, it's being used as an art studio. An artist is creating around 35 paintings for the entire complex. There will be a spacious walk-in closet, a private bathroom, and access to a beautiful balcony with a glass railing.
Let's head outside and take a look.
We're currently working on the pathways.
The steps are being poured and we're adding a roughened surface so the stone finish can be bonded on top with better adhesion. On the neighboring villas, landscaping is also in progress.
Everything there will soon be ready for furniture installation as well. The project is moving forward. Housewarming is [music] just around the corner. We plan to fully complete this project by the end of the month.
>> [music]
Related Videos
U.S. Military Just Flexed The Most Dangerous Aircraft Ever Built The F-47
MaxAfterburnerusa
11K views•2026-05-29
Heating Staying On On The Hottest Day Of The Year
PlumbLikeTom
507 views•2026-05-29
발전 효율을 높이는 태양광 추적 시스템의 기술적 원리 #공학 #공정 #태양광 #알고리즘 #재생에너지
찐현장기술
2K views•2026-05-29
How Far Can A Tomahawk Missile Actually Travel?
WarCurious
13K views•2026-05-28
직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp
월드촌촌
2K views•2026-05-30
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K views•2026-06-02
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 views•2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 views•2026-05-31