In homestead construction, tubular steel frames are commonly used as structural supports for floor systems, providing strength and stability. When plywood dimensions (typically 8 feet) are insufficient for the required floor span (10 feet), additional tubular supports are installed to bridge the gap. The construction process involves installing the tubular frame first, followed by painting with primer and varnish, and finally placing the plywood floor panels. This method allows for efficient use of materials while ensuring structural integrity for the floor system.
Deep Dive
Prerequisite Knowledge
- No data available.
Where to go next
- No data available.
Deep Dive
Homestead Construction- Tubular Steel Floor Frame + Toyota Work Check UpAdded:
Hey everyone, so I'm just ready now to go there in the town.
And Oh.
Yeah, they are done here putting a long span.
Yeah, and they are going to proceed here now in the floor.
Huh?
Huh?
Okay, so they are going to proceed here now for the floor.
And >> [music] >> Okay.
So yeah, we need one long span.
So they just used the tubular here as a frame for the floor.
I'm going there now in the town and those person who going to pull out of our sugarcane, they are going to work there tomorrow. So we just get the land that my cousin sell us everyone, the 300 K thousand. So yes, earlier my mama just go there in the store where they sell a fertilizer. So we just bought there also 10 sacks of fertilizer.
And the one sack it's cost 1,200 pesos. So we just only bought here since there's a one association that they sell a fertilizer because if we are going to buy there in the town, it's also the same price but we need to paid for the tricycle for the fare. So every sack we need you need to paid like 60 pesos. So if 10 sacks you need to buy you need to pay for the tricycle 600 pesos. So if we So yeah, that's why we just buy only here so that we can save also.
Yeah, and tomorrow those five person, they are going to pull out the weeds there in the sugarcane and they are going to clean also since there's [music] a uh leaves of sugarcane there. So they are going to fix that so that they can clean the sugarcane. So yeah, everyone, I'm going there now in the town and hopefully there's a tricycle there outside because [music] Oh my gosh, it's already 12 in the afternoon and there's no internet here.
So I need to go there [music] to upload some video and buy some other materials that need of our workers. [music] Yeah, and Yeah, that's it everyone. So you would like to come with me? Yeah, let's go.
Okay, everyone, so I'm ready now.
One and one half black screw.
Yeah, we need to buy that.
So I'm going to go there in the Fonda and I'm going to upload some video there and after that I will go home because we need a screw for the floor.
So yeah, guys, I'm ready now.
Okay, guys, so there's a two tricycle here. Good thing.
So I can't Hi.
So I can't wait here like minute.
Now Just uh stay here at Fonda Cafe for like how many hours because I just upload some video here. And yeah, I already upload some video and it's already 3:00 in the afternoon. So it's time now to uh go. But first I'm going to stop there in the one calibration because I'm going to check the car there if they already fixed it.
So yeah, let's go there everyone.
And after this is I'm going home.
So let's get a tricycle here.
Yeah, it's really really hot. Oh my gosh.
So hot here in the town.
So yeah, I'm here now in the one calibration, guys, and yeah, let's check the car there if they already lift up or not.
Yeah, I don't think so if they already lift up the car.
Okay.
So they just charged the battery first and they just changed the different battery but it's not going to run.
That's okay.
So they are going to borrow this battery to put to put there in the Tamaraw.
Okay.
2 in?
Okay, guys, so they already lift lift up the car and it's just on the 2 ft. A 2 ft?
Before it's just 1 in. So yeah, how many in now?
And now it's almost five. Before it's just only uh 1 in.
And now it's almost 5 in.
Okay, and looks good now, isn't it? It's really good. Looking.
Nice. Looking great, isn't it?
They already lift up the Tamaraw.
And here you go, guys.
Let's check here.
Okay.
Air con?
Air con?
So only the air con that they needs to fix. And glass again.
Oh, okay. And you manage to uh Okay, so next week they are going there in the registration area, maybe on Monday.
Yeah, before they are going to uh go there in the glass and the air con.
So yeah, here you go, everyone.
So the only things that they didn't fix yet is the um glass, air con, and the registration.
I don't know here.
Yeah, I think over here they already fixed, too.
And also the the wiper, they also going to change it.
Okay.
They already fixed here also.
No clearance, no?
>> Yeah.
So the clearance of the tire it's big now unlike before that no.
Looks cool now.
And here it's also done.
The carburetor distributor.
Okay.
They already changed also the water. I don't know.
reservoir >> [laughter] >> Okay.
So yeah, that's it guys.
I don't think it's a glass.
No.
Okay, so they just also tried to run the car before and it's also running.
So they are going to try to uh open it.
So they are going to start the car.
Okay, so they are going to try this one.
Oh, it's so hot. Oh my gosh.
So they are going to try.
Okay, it's also running so good.
cool Uh the RPM Okay, so the RPM it's also working.
Uh okay.
Okay now.
Yeah.
That's great guys.
So I'm done here in the one calibration now and yeah, after this I'm going home too.
So yeah, I'm so happy that they already uh lift up the car. So it's looking great, isn't it?
1,000 1,000 one and a half Okay, so I just stopped here in three bulky because they're in the void. They don't have a black screw. So I just bought here one box and it's cost 1,000 pesos.
Okay, so I just bought here also a finishing nail.
1 kilo and it's 80 pesos.
Hey guys, I just we just stopped here in the void. I just get my order earlier a one long span the primer and the varnish.
>> [laughter] >> Okay guys, I I'm here now in the Mansala now.
Okay.
Let's go home guys.
Yeah.
I don't know if the workers still there.
So let's check.
So I just get home now and let's check the workers here.
Oh, wow.
That's so amazing.
Wow, nice.
So they already put a uh tubular here as a frame. Nice.
I need it.
Oh.
16 16 cut Okay.
Since our plywood is just only 8 ft, so he just put another tubular there.
The dimension is 10 ft, but the but the initial size of the plywood is just only 8 ft.
Okay, there's a support clip.
Nice.
And here is the long span that I bought earlier.
It's also 10 ft.
The same over there.
Okay, and the owner got the chainsaw.
They are going to cut these three.
>> [laughter] >> Okay, so they are going to cut this and good things we just wait for me also.
Nice.
Okay.
Uh we need to paint also.
And after that they are going to put a plywood.
Yeah, and I just bought there a primer earlier.
Yeah.
Nice.
Okay, it's over here.
Okay, so since it's already um 5:00 in the afternoon, so the workers they just go home guys. And tomorrow they are going to come back to put a paint here in the tubular and also put a varnish in the plywood. And maybe after that they are going to put the uh plywood as a floor so that they can proceed here in the um wall.
So everything is So everything is uh nearly done.
Yeah, and tomorrow there is someone who going to pull out some weeds there in the sugarcane that we bought abroad. And yeah, I think tomorrow I'm going there also to film them.
Yeah, maybe just only in the afternoon because in the morning I I was because in the morning because in the morning I'm just film the workers here.
And maybe on Sunday I will go there in the town to the to upload some video again because we don't have here a internet. Oh my gosh.
But that's okay, guys.
Yeah, everything's will be okay.
And it's just so fast here because they just get one truck earlier.
Yes, very it's very fast, isn't it?
Okay. It's okay.
We're going to start now.
Doing a chainsaw here.
Okay.
Okay, let her go to try.
Yeah, thank you again.
Okay.
So yeah, that's it, guys.
Oh.
It's not really cut yet.
>> [laughter] [laughter] >> There's still more.
Okay, I don't know try that.
Very good.
Okay.
My 30 years? 30 years?
Wow, this mandiricacao years this mandiri this mandiricacao tree it's almost 30 years here.
Oh my gosh.
Yeah, that's great. Oh my [laughter] gosh.
>> [snorts] >> Okay.
>> [snorts] >> So down of the plywood they are going to put a paint A.
Primer and then the upper is varnish.
So yeah, they just get a one truck here earlier. It's just so fast, isn't it?
They are very hard working, that's why.
Very hard working? Hard working and friendly.
I just remember before when Roy he's in work and then I said, "Oh, that's my man, very hard working and friendly."
So yeah, guys.
So this is the end of our video for today's video. Yeah, and thank you so much for always joining and supporting us. We really appreciate all your supports and bless the and please don't forget to like and subscribe if you're not done yet. So see you on the next video. Bye-bye.
Oh my gosh, look at this the two puppy.
George it.
Playing here since the sugarcane here it's um already harvest.
Yeah.
Related Videos
U.S. Military Just Flexed The Most Dangerous Aircraft Ever Built The F-47
MaxAfterburnerusa
11K viewsβ’2026-05-29
Heating Staying On On The Hottest Day Of The Year
PlumbLikeTom
507 viewsβ’2026-05-29
λ°μ ν¨μ¨μ λμ΄λ νμκ΄ μΆμ μμ€ν μ κΈ°μ μ μ리 #곡ν #곡μ #νμκ΄ #μκ³ λ¦¬μ¦ #μ¬μμλμ§
μ°νμ₯κΈ°μ
2K viewsβ’2026-05-29
μ§κ΄ λ° κ³‘κ΄ λ°°κ΄ κ²°ν© κ³ μ μμ #worker #process #fabrication #pipework #clamp
μλμ΄μ΄
2K viewsβ’2026-05-30
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K viewsβ’2026-06-02
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 viewsβ’2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 viewsβ’2026-05-31
How Far Can A Tomahawk Missile Actually Travel?
WarCurious
13K viewsβ’2026-05-28











