Large concrete structures like dams require sophisticated thermal management to prevent cracking; this is achieved by embedding thousands of kilometers of thin steel pipes throughout the interior, through which cold water circulates after each concrete lift to carry heat away from the core, combined with limiting each concrete column to 15 meters on a side and 1.5 meters in height with a minimum 3-day curing period between lifts.
Inmersión profunda
Prerrequisito
- No hay datos disponibles.
Próximos pasos
- No hay datos disponibles.
Inmersión profunda
The solution involved embedding thousands of kilometers of thin steel pipes throughout the dam's intAñadido:
The solution involved embedding thousands of kilometers of thin steel pipes throughout the dam's interior.
Cold water circulated through these serpentine pipes after each concrete lift, carrying heat away from the core and preventing catastrophic thermal cracking. Each concrete column was limited to 15 m on a side and 1.5 m in height with a minimum curing period of 3 days between lifts. This block pour method transformed an impossible thermal problem into a methodical sequence of thousands of individual placement.
Videos Relacionados
U.S. Military Just Flexed The Most Dangerous Aircraft Ever Built The F-47
MaxAfterburnerusa
11K views•2026-05-29
Heating Staying On On The Hottest Day Of The Year
PlumbLikeTom
507 views•2026-05-29
발전 효율을 높이는 태양광 추적 시스템의 기술적 원리 #공학 #공정 #태양광 #알고리즘 #재생에너지
찐현장기술
2K views•2026-05-29
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 views•2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 views•2026-05-31
직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp
월드촌촌
2K views•2026-05-30
How Far Can A Tomahawk Missile Actually Travel?
WarCurious
13K views•2026-05-28
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K views•2026-06-02











