Concrete floor pouring is a critical construction process where steel reinforcement mesh is placed on a bed of rocks to elevate it above the ground, preventing direct contact with moisture, followed by the careful pouring of concrete to create a structural base that will later receive tile or other flooring finishes.
Deep Dive
Prerequisite Knowledge
- No data available.
Where to go next
- No data available.
Deep Dive
Day 78 : Pouring of the floor begins 🇵ðŸ‡
Added:[music] [music] Morning guys. Welcome back. It's a little loud in here, so please bear with me.
There's a lot of work going on right now here inside the house. They are compacting the um spare bedrooms and uh I think the office they are prepping to pour the bedroom.
The master bedroom already have steel on the ground. And our plumber Marlon also is working on the the pipes for the the water line.
So, they have steel in the closet, walk-in closet, and here in the master area, bedroom. So, these are the steel. It's not touching the actual ground. There's some rocks to have the steel a little up on the ground, so it's not going to be sitting on the bottom of the floor.
Okay.
And they're still doing the uh what do you call this?
Skim coating here. [laughter] That's a lot of stuff going on right now.
>> [laughter] >> I think this room is done and the hallway.
So that is the latest. Right now we have a delivery of cement in preparation for the pour.
We have 100 bags ordered.
But that's the latest update right now.
>> [snorts] >> Heat. Heat.
All right, guys. We're at the property.
It's about 8:40.
No, it's not 9 yet. 8:42.
And uh we're pouring the floor in our bedroom.
So, we're going to set you up so you guys can watch this a little bit.
What happened?
[snorts] >> [snorts] >> 60 by See you later. [screaming] [screaming] Heat. Heat.
[clears throat] [snorts] There you go.
What else?
>> [snorts] >> What we got?
What happened to that?
camera.
[laughter] Shout out camo sa familia mo gon.
[laughter] All right, guys. It's uh 10:17 and the guys are still on a little break. We're going to try and get a quick video before they get going again. So, [snorts] they've got uh the floor almost done in the uh walk-in closet and the um master bedroom.
>> Oh.
>> Um so, uh it's rough, but we don't we don't care. Um tiles are still going to go in on there after, you know, later on. So, doesn't matter if it looks rough right now. It's not supposed to be smooth.
Um that's not going to be a permanent uh finish of the floor. Uh so the um gutter on this side for the the roof uh they said is done. I think they have one little piece they got to just slap in there real quick and then they can start laying the the panels out for this part of the roof and then the the house will be covered which is awesome. I'm really happy about that.
>> Really happy about that. Guys are doing great on skim coat. I mean they're just cruising along. Tonan and Carlo are just moving on, you know. So they're doing really well. So, that is going to be our quick update for now. We'll be back later and and show you the progress a little bit later this afternoon.
>> Welcome back to the channel. It's their break time, so the guys are just getting out of the house. [laughter] is there.
Um, so Boom Boom is still up in the roof and he's telling our other workers to just throw some snacks for him.
Let's go here inside and check the update.
There's some steel here on the floor on the ground. Here in the living room, it's not going to be on touching the ground. They will put some once they already lay it out, they are going to put some rocks to lift to have the steel um above the ground. So, it's not going to be like that.
[cough] And uh the the foreman [clears throat] is um getting ready prepping for the level of the [clears throat] the floor.
They already poured in the master.
So that's all poured this except for the bathroom. The master bathroom they already poured. Oh, they already poured both um bedroom.
They are they poured the extra room and the office. These are all poured which is really nice.
So, that's done. [panting] I'm the one doing the update because Mark's doing something else. So, please bear with me.
I think they're working here in the back for the gutter or the whatever your patient. I don't know. I don't know. Like this.
They're working on like this. I'm not sure if I can go in here. Like this and like that. That's That's all you get from me. [laughter] They're working with this that uh beige color one.
That's the one like this one. That's mark.
They're putting it on the side before you put the the green. Uh I don't know if that's for the gutter.
I'm not really sure. I will just have Mark explain it all for you.
But they're still working on that side of the roof. They closed the gap [sighs] for here. Like in there, you can still see there's one light right there. So, but this side is already all closed.
Oh yeah, that noise is the mixer. They're mix they're cleaning the mixer at this. But we'll go back to you later for another update.
Workers are back to working.
>> [panting] >> Ed has a mission to clean the mixer.
Hey there now.
Malamara.
All >> [clears throat] >> right. Am I done?
One more time.
>> [clears throat] >> I don't believe [snorts] the dogs are crazy.
Mont are bonjing just went to the the vet this morning and they have him checked.
Now they're both crazy. No, I don't want you go. You go play. Come on. Go play.
>> No.
Oh boy. And someone will get jealous.
See?
>> [laughter] >> They've been locked up in their cages for long time because that's the the the doctor's advice that they have to limit the physical activity.
And there's some dogs out here and they haven't had their vaccines yet. So, they cannot really be around other dogs.
See, he's crazy. This one's crazier.
Monty, he's going back to the vet tomorrow.
>> I want Ed to take him back again so he can get used to going that way. So, so he knows exactly where to go. Not go this long way.
>> No, >> you went down through >> Sanro.
So jealous.
>> So jealous.
[laughter] >> Just go to your sand.
>> Do we have water for them?
>> They're back.
They are pouring the pantry floor here in the pantry.
That's what they're doing right now.
This one is not done prepping. So, this will probably be the last um this will be the last part to be poured.
So, I don't want to be in their way.
Uh, we're going to let the dogos um out so they can run a little and then feed them after.
their their food has already been soaked.
So, it's already so swollen.
So, yeah, I'll be back to you later.
They're pushing it to another um batch of concrete mix.
Uh it's I think it's probably 5:00 now.
So, that's the last before they stop. It's quiet time at 5 and they are still pouring there in the pantry. They're almost done. And I don't know what else are they going to to do.
Why do they want more of this?
Probably in the hallway. I'm not really sure.
They are pouring here.
Bye-bye.
Vitamin lang sa 4x4 Sorry. [laughter] Good morning. Yeah, is retouching the >> rivet.
Putting some of the green paint to hide the rivet.
It's quiet time. That's why he's done with the he's done with the using the tools and the painting job can still continue because there's no loud machine or tools needed for that.
and they're pouring the hallway right now.
So once this uh part of the house gets the roof, it'll be dark in here.
Oh, and the the pantry is done.
So they can probably put um skin coat on here tomorrow.
All right, guys. It's uh what? 5:30.
Um, and it's quiet time, so the guys are not mixing or using any noisy tools.
So, we'll uh show you guys what uh what they [clears throat] did today. Let's go around here first. We'll show them through the windows.
So, lots of uh skim coat got completed today and a lot of pouring. A lot of floors got poured today. So, uh, the office floor is [snorts] done.
Um, and again, this is this is a rough floor. It's not finished. Um, tile will go in there eventually. This is just a rough uh finish. So, same with the spare. And the hallway out there is poured as well.
Uh the master closet is poured as well as the master [clears throat] bedroom portion is poured.
Um the two bathrooms are not poured.
So they will do that later.
And then Axel and Larry are up doing the fascia.
>> Faster.
>> It's looking good. Faster, faster.
>> Um, so the pantry has been poured.
>> [snorts] >> So, that's all finished and poured in there. It looks really good.
Looks nice.
[snorts] Um, looks totally different with the floor and being uh skim coated.
So, you can see the steel in here. And I know what somebody will say, "Oh, it's laying flat on the ground." We we get it up off the ground once they pour. So, they're going to put some stuff down underneath.
So, you can see the um water line and it goes all the it goes in and it goes down to the other bathroom as well, hot and cold.
Uh so, the hallway's been poured.
So, probably tomorrow this will all be poured. This will be really nice uh to have this poured. And hopefully we can get this done out here.
um and get this roof up there. They've kind of held off on this portion of the roof.
Uh they're um >> finishing >> doing the flashings and and the fascia and that kind of thing over there trying to get it completed. And [snorts] there we even have a little thing of paint to go around and touch up all of the uh rivets so it'll all be green. any scratches or anything. And and you'll see you can see the rivets are already painted up here.
>> So, uh just little details that uh our guys are doing. Um it's really coming along great. [snorts] Uh hopefully within [clears throat] I don't know by the end of this week hopefully we'll have our our windows that do not open ordered and we'll get those in next week hopefully.
Um so nothing nothing happening over at the shed today. They were focusing on uh the pouring today.
So, that is going to do it for today.
They're cleaning up the mixer. That's looking good now. [snorts] Um so, we'll have to get some more back fill and stuff, but uh coming along really nice. Uh it's looking good and um I've been very happy with uh the progress the uh skim coating and stuff. We started on the outside. We did waterproofing skim coat and without even a blink of an eye, the guys that are doing that just transitioned and moved inside to start skim coating and doing stuff in there.
uh cuz they have to allow this concrete out here, the plastering to to cure. So they went inside and just started skim coating in there. So Tonton and Carlo have done a great job [snorts] as all of them have.
So um that's going to do it for today.
So uh as always, thank you guys for watching. Um we appreciate all your uh all your comments. We will we will respond as quickly as we can. And uh [laughter] if you like the video, like it, share with your friends, family, and everything. And uh we'll see you tomorrow for another build day here in the Philippines.
Related Videos

Audi RS5 4.2 Tuning JDEngineering
JDEngineering
1K views•2013-11-14

DALI + KNX: 500 Lights Offline! BCU Code Lock & Short Address Fix!
EngineerIsmailTech
560 views•2026-04-13

Explaining Quality Control of Concrete
maherbader
4K views•2019-05-25

World Mining Production Peaks - Lead Antimony Arsenic Titanium & more
LucarioandDialga
1K views•2019-04-19

Tech Titans: LFP vs Sodium-Ion Battery | Which is the most effective energy storage solution?
Enfsolar
522 views•2025-11-06

Doing the Math: Analysis of Forces in a Truss Bridge
TeachEngineering
1K views•2025-06-06

Inside Midnight Fighter Jet Refuelling Secrets of Stealth Missions | WION Podcast
WION
3K views•2025-09-20

Flash Point, Fire Point & Auto Ignition Temperature
HSELessons
38K views•2019-08-28
Trending

One Must Imagine Sisyphus Happy
vlogbrothers
61K views•2026-07-21

The Downfall of OnePlus!
techwiser
65K views•2026-07-21

Tariq Nasheed Destroys Pan African's False History Claims
IzmRadio
24K views•2026-07-21

My Friend Locked Up The Engine On His K-Swapped Bug...
boostedboiz
128K views•2026-07-21