This video demonstrates the complete process of installing and finishing drainage systems for a bungalow extension, including trench excavation, pipe installation with proper bends and connections, cable burial for electrical work, backfilling with appropriate materials, and final site cleanup. The builder emphasizes proper drainage planning, including positioning of gullies, manholes, and bosses to ensure efficient water flow and prevent flooding issues.
Deep Dive
Prerequisite Knowledge
- No data available.
Where to go next
- No data available.
Deep Dive
extension drains completed
Added:Right. Morning guys. Welcome back to our builders. New week. Same job. New week.
Uh doing this today. Just clearing that mess. We're going to chop this out. Get the final bit of the drains on this side of property. To this point, we've got a toilet, soil stack, and a gully for the shower and sink to put in here.
Charger's moving up. We're going to bury this cable as well. We're going to Trish's coming. New cable. We're going to bury him a new cable in under here.
Bring it up so we can lose that on the wall cuz I don't like to see that. We've then got to dig a channel through there for him. Put power to the garage cuz we disconnected that because it was it went through here just bodgeged in which again we don't like to see that. So, we'll bury it and get a new fuse board in there. It's all getting rewired. had a chat this morning about what's happening with the garage. I'll tell you later about when we get a bit more time.
Uh yeah, basically clear this clear that clear the garden now and then we can work our way out cuz it's so tight here.
We want to get everything out with that first cuz we'll end up in the hole. If not, it's better to run on concrete than it is on on even tight one cuz if it tips, we're going to be into that wall and charger. So, we don't want to do that. So, put you on time lapse, do this. I've got a coffee look and uh we'll start our week on here.
[music] >> [music] [music] [music] >> Hey, hey, hey.
>> [music] [music] >> Hey, hey, hey.
Right then, that's that tidied up. This is gone.
We'll just sweep this up. We don't know what we're doing with this yet. Customer don't know what they're doing yet. So, we'll uh leave that as is. And now popping this out.
Teeth shattering.
Yeah, I'll put you here. Let's get this out.
[music] >> [music] [music] [music] >> Heat. Heat.
And we're out. Ready.
Right. Set up now. Got a manual 90 bend into there for the toilet. And then we'll run this in. So I'll put you back here. Get this done.
Heat.
[music] [music] Heat.
>> [music] >> Heat. Heat.
[music] >> [music] >> That's that drain in and complete. Just back from snap now.
Uh got that in. So that's for the toilet.
Obviously they'll all get bossed into there. All the drains from inside. Not going to do a gully now. Spoke to Christian plumber. We're going to send everything to that corner. Boss them out. There'll be two bosses into that stack. So it'll it'll make sense in that corner. Trish's going to move that up this way now. He's bringing me some cable later. So I'm going to run the cable in back into the building there.
Then we can back fill this in the morning. Just need to chop him a track out later to get the cable through there as well. Uh just been filling this skip then for the last 10 20 minutes. Trying to squash it down a bit cuz they're that expensive now for a skip. Stupid. All it is is plastics really and bits and bobs out of these bikes.
So we aren't getting wacker on top of it and smashing it in. But it's only squash flat plastics basically. So there'll be another grab lorry coming unless we can get that on top of it and squash it.
That might be a a better option cuz it's might squash down. So anyway, we'll get this sorted and then we'll bring you back once we're doing that track round the back.
>> [music] >> Right, that's us done. We've just uh stuffed the pipe through the end of hole that we found. So, what I'll do in my head, Tristan will uh put his wire onto that, pull it through and draw it through. Pop through there. He's got the key. So then he can drill a hole through, take it up inside, put it here, ready for a new fuse box, and then he's going to run me another cable down here basically to replace that. So that will come out from under that pipe, bury it in here, put it in some trunking and wrap it with uh the electrical tape cable, put it back up, then we can back fill tomorrow. That's pretty much drain's done around here now. We've finished.
We've just got around the other side hole. I'll take you around, show you what we got to do. by uh we're just putting digger away because that's that's going tomorrow now because we can't come down here. As we said when we dug this, we're not allowed any machinery on this.
Um right, so we've got that's it. We're going to put a gully here. We'll have to hand dig this down here. Only have to be a foot deep to this point. This man, as we found, this is it's been filled in though. The drain to the house passes through into this manor onto the neighbors and into that there. So, we've got to take this out. All this had a word of neighbor. Happy for us to take this down. If it falls in, I'll put his fence back up for him. We need to get a manhole there. Pick that one up.
Then in this room, which is now utility room, we've got to put a gully here to pick up washing machine and sink.
And then this is the one that's failed.
So, we've got to take that out because it's not doing anything at the minute, but it's running back inside. So, new gully, bring it all the way down. We'll smash all this concrete up and then connect that pick that gully up on the way into this new manhole here. So, that's uh Digger Man's away for a couple of days now. He's got a show to go to. So, we won't be back till probably Thursday doing this. So, it gives me two days to finish inside and the PL are coming tomorrow. So, we'll get on with that Thursday, Friday. But yeah, that's end of video for today. Little job on the way home if I can film. It's the footing I did for that steel building.
He just wants me to break a window up.
So, I'll come and do that for him. But if not, I shall see you back up here in the morning.
Right. Morning. Back up here.
Uh did that job last night. I didn't film it cuz we were we were pushed for time. We're uh I think it 9:00 time I finished just a window and a brick up of a window. So yeah, that's all done for him. So he can move on. I will show you that cuz we've got some steel to do on that job. We have got a steel beam to put in that we had a chat about last night. So it be a couple of week there for that.
But right while we've been away, Trish's been put the power in. We uh power's into the garage now through this channel and then new cables in for car charger.
So that there replaces that on the wall basically. So I can fill this in now.
We'll go and get some uh pea gravel round, get this graveled up, put this back in. Whatever don't fit goes on the pile and then uh we can get the rest of that stone. Just put it over the top and then diggers going this morning. So that's that.
Do this first and then I think we'll be insulating for a couple of days. My mate's back in a couple of days time to do the other side of the drains. We'll bring the little digger in for that cuz it's a bit tight around there. That's a little bit too big for uh swinging around that fence and what have you around there. So, right, we'll set you up somewhere here.
Let's get this uh back filled.
[music] Lightsing, music, we're in the zone, moving, feet. [music] We're not alone. Lost in the feeling alive. Dancing through the night. We let [music] go and thrive. Dance at the party. Let the music take control.
Feel the beat. Let it move your soul.
Hands up high. Spirit [music] soaring free. In this moment we're wild and carefree.
[music] Friends [music] all around. Laughter in the air. We're a united tribe, [music] a dance affair.
>> Right. Then that's that filled in.
Obviously, we're just coming up to the top cuz we're not sure what customer is doing yet with this uh with this well the levels basically. So, what they're going to do, there will be a gate at that point on this garage. And then uh if they want to slab it or if they're going to concrete this back up or whatever, drop the levels, they'll have to just fiddle it at the time. But that'll be coming out at that point. If not, they can just bring more stone up and then to me I I would I would lose Well, they're not bad at that cuz the damp cruces there course is there. So, they can they probably all right. They can slap straight on top of this and then then angle it round to that.
They've got plenty of room in there.
Plaster's made a start. He's in there.
Um so, yeah, I'm going to touch on what's happening with this now. We was down to render this and timber it out inside 100 mil of insulation and then uh plaster board it into a room basically take the door off. So we're not doing that now. Customers like they're just going to use it as a gym. So they're going to keep it as brick. So they've got the contrast potentially rendering it whenever cuz they're going to put the bins down here. So they don't want to put in bins against brand new render cuz they're going to yeah they they'll scratch it. I just know they'll end up bumping it.
probably wash this down, potentially point it for them or whatever they want to do. What we're going to do, we're going to render these two pillars at front. Obviously, composite gate will go on, whichever they have. The door's going to get sprayed. We'll whip the door out and we're going to put my new frame in. And then we'll probably get the black cladding to clad the frame so it'll all look the same. And once they paint that the same color as the windows, that's that. So, the door will get bricked up still. I'm going to block that up. I have to get the bricks, but they're going to have French doors put in this back. So, obviously cut them down, pinch the bricks from there, and I can break the door up with them. And we might have to do a bit of pointing here and there. That's to go in the skip. Lot of roofers didn't take that when they went. So, we'll get rid of that.
Obviously, it's connected in here. We'll get rid of that for them. Uh that can stay. Like I say, it's down here stand.
They're going to then slab this area.
This will all get slabbed. bit of a curve around whichever or to that building. So all that is uh courtyard and they've still got plenty of garden left.
Yeah. So all that will be either landscaped or this can be brought up to the same level. We're taking that out.
Customs asked us to remove that. So once scaffolder gets his arson gear and shifts that lot, we're going to pull that out from we've got the digger coming back Thursday. So, if we can get rid of that, dig that out, top soil it, probably have to top soil everything.
And then uh cuz there is a step down or there always were cuz there were a pond there. If if you've been watching this from the beginning, you you'll have seen there were pond and a change of level.
So, what I do is just top saw the whole thing. Get all that border out, whatever they don't want. And then they can relay a nice lawn here. All this tuck down to the same level. And then where I'm stood, yeah, you can see there's not much of a dip, but this dips away.
There's a change of level around that point there. But yeah, that's one for another day. But like you say, they we started discussing what we're doing with this bit. Not doing patio. So I'm sure CLA, you watch these videos, I'm sure you'll talk me into it. Right.
Um talking that radio. I'm inside now. I'm going to insulate. So I'll set you up inside, see what we're doing in there.
Uh diggers going any time now.
Uh and then we've got this obviously grab lorry but we've got that other side to break out. Show you [music] forgot to say earlier just jump back on.
Obviously this is tidying now.
They've [music] came those pings 123. Look at this [music] massive even anyway [music] on a normal size building not one like so that span from that ridge to that span I think with 2.8. So that beast [music] is going in the middle of that span.
Don't tell me these engineers aren't being stupid. There's a 9 before and end of this one. Do you know how to carry that [music] roof?
Same eight. That's only [music] 36 on that span. I think there. So we've got a 94 in there. Then we've got two 123 going into the other way. Tell me [music] that that's not over.
like everything on this [music] anyway.
Yeah. So, we got them in in a minute, but I'll uh get something here.
[music] [music] Heat [music] up here.
[music] >> [music] [music] >> Right, that was for another day.
Put them last two on. Got them lights on. I've cut the pllings. I've got them up there. There's one here and one one there. Look at size of them things. Um I'll stick them in the morning. That's them sorted. Uh plaster has started. So that's the first window framed. He's done the cuts. He's worked it out now.
It takes a bit longer. Once you've got the cut sorted and he knows the angle, he can just template it. That's it there. Look. So I'll show you. So he's templating it now.
75 91 + 10 + 10 and then he knows it works.
So that there will fit on every one. So he's he's got the size basically. Uh takes a bit more time doing one. But once you've got one, I dare say he'll have them three done tomorrow. They'll be finished that side. Then he can come there. I'm going to pick some more insulation up in the morning and start coming this way. Uh but yeah, that's it for tonight. So, I shall see you back up here in the morning.
>> Right, morning. We're back on here again. Messing.
I didn't film this morning cuz you can't really see much in here, but we now have them pings I've been moaning at for the last 8 weeks, whatever. It's been in place.
That's boxed off. So, now break my neck.
Wait there. Two sec.
We can put all this in now. infill this down here. Last little bit on uh plaster's done that so you can see the shape now. He's not bad this lad. If you need any plasterers, give him a ring cuz he's got some good lads in his phone.
Right, I'll set you up here then. We'll get this done and then hopefully we're done with this insulation today.
[music] >> [music] >> Heat. Heat.
>> [music] >> Heat. Heat. [music] [music] Heat.
[music] Heat. [music] [music] >> [music] [music] >> Heat. Heat.
[music] Right then, that's us done for today.
That's three done. One to go tomorrow.
Get that one finished tomorrow. I've literally got that top run now to put in down there. That's all done.
Uh what else we got to do?
Yeah, that's pretty much it. So, uh got the drain digger man back tomorrow.
Basically, little mini diggers coming.
We're going to get down that side. I'll jump in here first thing. Finish this and then plaster it. We'll be on that middle strip down there on Friday.
That's the plan. So, see you back here in the morning.
Right. Good morning. Back on here.
Digging this out. Found the gas all intact.
Biggest bike dumper.
That's the problem. So, this is why we're doing it. Whichever clown has put this in, the drain is absolutely brought to the top. So, all this water has just been running around here and filling under this. This is why we're changing this if you can hear me over that digger. Um, but yeah, I'll set you up here. Then, we're going to go way down here, sort this out.
Uh, leaking that. That's coming out.
Fetch this out. Get into this manhole.
Then we can connect that all the way through to where I'm stood into a new manhole on our side on this side of the fence. Said it before, look, there's one there. There's going to be It's crazy when it's got that one. But we've got to break into it cuz we're changing direction saying that. So, it's it's on the plan. Let's get it done. Uh getting into it that there's one a meter less than a meter away from it.
Uh when we can just get onto the pipe cuz it's only rain water this really what we're putting in. Anyway, get a manhole here. Set you up. Watch us pull this path down.
[music] [music] Heat. Heat.
[music] [music] Heat [music] up here.
Heat. Heat.
[music] [music] [music] >> [music] [music] [music] >> Right. Afternoon, guys. I didn't I've not filmed this morning. We're that busy here, there, and everywhere. So, plaster is complete. That wall, all them bits are in. That side of the ceiling's prepped. I've been in this morning.
Finished that insulation off. That's all done now. Just got that strip in there for him. Ready for Monday. He's on with that this afternoon. Get that done.
We're out round the back on drains. I'll take you around there in a minute. So, I'll set you up. You'll see me round the back. We'll set you up and we'll do them drains.
Right then, that is drains complete. I didn't film because there nowhere to put you really. So yeah, got this in stoned everything back up now. Just been around and uh clean neighbors off. Nice to let us come on and get this done. So this one's in now. All these are in. We had to go for sections in end cuz we couldn't get it. We've concreted everything back in. Uh I've just got to get a lid for that on Monday. So we'll just form that in there. This is for this one which is dishwasher.
dishwasher and sink basically and then that bring you down. I've got that to do Monday. Finish this block work off. Down pipes on.
I think we're looking at three or four days next week for me pretty much if that to get everything tidied up now.
Get washed down what we can and then leave it for renders to do everything they need to do. Clear this up. Last little bit that can go in that hole you've just seen. So that's that. I've got that roof to do. That's why I've settled that. I should have been on that today, but not a chance. Oh, that drain were a pain in the bum. So, plasterer, don't know if I shown you earlier. He's all set up now. Taped everything up ready. He's in tomorrow. Do that triangle. Do the first section of that ceiling and that strip up to what is that steel. And all that is ready for plastering Monday morning with his mate.
He's going to do the other side for next Friday. This this job's finished plastering wise. Going to knock through next week as well. Knock through. Fit that frame in here and pick another frame up for that because it's not quite wide enough.
So yeah, we'll swap that. We'll just line that with the 6B1 or and then we'll put we'll plant the uh the plants on after. But that's it. End of video for this week. Thanks for watching. If you have enjoyed what you've seen, if you can give us a like, hike, share, uh subscribe if you're not subscribed.
Well over 800 now. Can't believe that.
But thank you very much people who have subscribed. Uh yeah, obviously showing you what we're going to be doing next week. Uh painters back as well. I think they're coming to this. They're going to plumbers in. They're going to fit that and paint this now for the color.
They've been customers been doing paint test is what they have in. But yeah, this is going to get his final coat.
That's getting fitted Tuesday, Wednesday, the on suite. So, all this has gone. Paint this the back end of the week and then he's in the following week to paint this and kitchen's arriving the week after. So, on track to where we need to be. So, yeah. Thanks for watching and I shall see you back up here in the next one.
Related Videos

Audi RS5 4.2 Tuning JDEngineering
JDEngineering
1K views•2013-11-14

DALI + KNX: 500 Lights Offline! BCU Code Lock & Short Address Fix!
EngineerIsmailTech
560 views•2026-04-13

Explaining Quality Control of Concrete
maherbader
4K views•2019-05-25

World Mining Production Peaks - Lead Antimony Arsenic Titanium & more
LucarioandDialga
1K views•2019-04-19

Tech Titans: LFP vs Sodium-Ion Battery | Which is the most effective energy storage solution?
Enfsolar
522 views•2025-11-06

Doing the Math: Analysis of Forces in a Truss Bridge
TeachEngineering
1K views•2025-06-06

Inside Midnight Fighter Jet Refuelling Secrets of Stealth Missions | WION Podcast
WION
3K views•2025-09-20

Flash Point, Fire Point & Auto Ignition Temperature
HSELessons
38K views•2019-08-28
Trending

One Must Imagine Sisyphus Happy
vlogbrothers
61K views•2026-07-21

The Downfall of OnePlus!
techwiser
65K views•2026-07-21

Tariq Nasheed Destroys Pan African's False History Claims
IzmRadio
24K views•2026-07-21

My Friend Locked Up The Engine On His K-Swapped Bug...
boostedboiz
128K views•2026-07-21