Sinkholes require stability testing before repairs can begin; crews pump water into the sinkhole to determine if it drains out (indicating instability) or remains (indicating stability), and only after stabilization can backfilling with dirt and earth followed by roadway reconstruction proceed.
深度探索
先修知识
- 暂无数据。
后续步骤
- 暂无数据。
深度探索
Sinkhole in Maitland remains unstable as crews pump 20,000 gallons of water本站添加:
WESH TWO NEWS HAS A CREW ON THE WAY TO THE SCENE, AND WE’LL BRING YOU UPDATES AS WE LEARN MORE.
IN THE MEANTIME, A SINKHOLE IN MAITLAND, STILL UNSTABLE THIS AFTERNOON.
WE FIRST BROKE THIS NEWS TO YOU FRIDAY ON WESH TWO NEWS SUNRISE.
THIS HAS SHUT DOWN NORTH WYMORE ROAD BETWEEN ORONO ROAD AND HOPE ROAD.
WESH 2 NEWS KENNY MASON IS THERE LIVE IN KENNEDY PUBLIC WORKS IS TESTING THE HOLE BY FILLING IT WITH WATER.
NOW.
THEY ARE.
AND PUBLIC WORKS SAYS THEY HAVE PUMPED 20,000 GALLONS INTO THAT SINKHOLE.
THEY SAY THAT THE WATER IS NOT STAYING, MEANING IT’S NOT STABLE AND THEY CAN’T START REPAIRS.
YOU CAN SEE THAT THE ROAD IS STILL BLOCKED OFF HERE WITH BARRICADES.
TRUCKS, EQUIPMENT AND CREWS FILLED A SHUT DOWN PORTION OF NORTH WYMORE ROAD IN MAITLAND ON MONDAY, AS ORANGE COUNTY PUBLIC WORKS TESTS A SINKHOLE.
DARYL MOODY WITH PUBLIC WORKS SAYS CREWS ARE PUMPING WATER TO SEE IF THE HOLE WILL DRAIN OUT.
AN INDICATION OF WHETHER THE SINKHOLE HAS STABILIZED ENOUGH TO BEGIN PLANNING FOR ROADWAY RECONSTRUCTION.
WE’VE ALREADY TALKED ABOUT 20,000 GALLONS OF WATER IN IT SO FAR.
THE SINKHOLE SWALLOWED A SECTION OF NORTH WYMORE ROAD FRIDAY MORNING.
WE DID GET SOME PRETTY DECENT RAIN LAST WEEK.
SO IT’S, YOU KNOW, NOT HARD TO IMAGINE THESE SINKHOLES FORMING IF YOU SPEND ANY, ANY, YOU KNOW, LENGTH OF TIME IN CENTRAL FLORIDA, YOU KNOW, THAT THEY ARE PRETTY COMMON.
PUBLIC WORKS SAYS IT WAS ORIGINALLY 20FT IN DIAMETER, BUT BY FRIDAY NIGHT IT DOUBLED IN SIZE.
HOWEVER, THIS WEEKEND THE HOLE SHOWED LITTLE TO NO GROWTH.
IT’S GOOD NEWS FOR RESIDENTS LIKE SUSAN JAFFE.
I REALLY WANT TO KNOW THAT IT HAS STOPPED GROWING.
THAT’S WHAT I WANT TO KNOW.
THAT’S REALLY, I WOULD SAY, MY BIGGEST CONCERN.
MOODY SAYS WHEN THE HOLE DOES STABILIZE, THEN WE CAN GO IN AND BACKFILL.
WE’LL REMOVE THE ASPHALT, WE’LL BACKFILL IT WITH DIRT AND EARTH, AND THEN WE’LL MAKE MAKE THE ROADWAY REPAIRS.
AND FOR NOW, PUBLIC WORKS SAYS THAT THE PLAN IS TO CONTINUE FILLING THAT HOLE WITH WATER UNTI
相关推荐
Heating Staying On On The Hottest Day Of The Year
PlumbLikeTom
507 views•2026-05-29
발전 효율을 높이는 태양광 추적 시스템의 기술적 원리 #공학 #공정 #태양광 #알고리즘 #재생에너지
찐현장기술
2K views•2026-05-29
직관 및 곡관 배관 결합 고정 작업 #worker #process #fabrication #pipework #clamp
월드촌촌
2K views•2026-05-30
Wire To Wire Connection Trick | Strong And Secure Electrical Joint #shortvideo #wireworks
ElectricianTips-b1h
5K views•2026-06-02
Peterborough to Newark Northgate Driver's Eye View aboard an InterCity 225 - East Coast Main Line
TrainsTrainsTrains
822 views•2026-05-31
AI turbine design: hypersonic cooling leap #shorts #ai #hypersonic
bobbby_rn
671 views•2026-05-31
Quality Interior Finishes in Small Rental Units | How much? | Build a bachelor unit
MAVConstruction
236 views•2026-05-29
BYD’s Latest EV Motor Breakthrough Could Transform the Entire Car Industry!
DriveWire-h8x
102 views•2026-05-29
热门趋势
Why Batman Lets The Joker Live 🤨
zackdfilms
9222K views•2026-05-30
They're Complete Trash
penguinz0
558K views•2026-06-04
The Murder of Deputy Caleb Conley
MidwestSafety
810K views•2026-06-04
I Bought FAKE HopeScope Merch (and paid a subscriber to give it a makeover) | Hopeful Hauls
HangWithHopescope
158K views•2026-06-04











